China honed limestone
(1)15 use thickest foam to avoid cracks.
(2)dilivery time: within one week for one container,if you need urgent,we can do for you faster.
(3)Dark Beige terms: TT prepay 30% or LC at sight.
(4)mainly 5:Europe 0 Asia 5
This entry was posted on 2009-03-21 01:57:08 at 2009-03-21 01:57:08:2009-03-21 01:57:08 2009-03-21 01:57:08 and is filed under Culture stone. You can follow any responses to this entry through the RSS 2.0 feed.You can leave a response.
Leave a Reply